AMG cooling tower assembly in Morrinhos/GO

AMG cooling tower assembly in Morrinhos/GO
AMG cooling tower assembly in Morrinhos/GO

AMG water cooling tower assembly service in Morrinhos, Goiás.

Site Preparation
Structural Base: The tower must be installed on a level foundation capable of supporting the total weight (tower + water).
Accessibility: Provide surrounding space for maintenance and air circulation.
Drainage: Ensure the base allows excess water to drain.

Structural Assembly
External Structure: Assembly of side panels, metal or GRP base.
Cold Water Basin: Attached to the bottom, receives the cooled water.
Support Columns: Installed to secure the tower.

Internal Component Installation
Fill (heat exchange media): Increases the contact area between water and air.
Droplet Eliminator: Prevents water from being carried away by the airflow.
Water Distributors: Pipes, rotating arms, or spray nozzles that distribute water over the fill.

Ventilation System
Impeller/fan: Mounted on the top or side, depending on the model (induced, forced, or natural).
Motorization: Electric motor coupled to the fan, which may have a speed reducer or direct coupling.
Air diffusers: Help direct the flow.

Hydraulic and Electrical Connections
Hot water inlet: Connected to the process return piping.
Cold water outlet: Connected to the recirculation system.
Drain, overflow: Auxiliary connections to maintain the water level.

Testing and Startup
Leveling the basin and checking for leaks.
Electrical testing of motors and fans.
Water flow: Check uniform distribution through the sprinklers.
Performance measurement: Inlet (TAQ), Outlet (TAF), and Wet Bulb (TBU) temperatures.

>> See AMG cooling tower models.

Client: Food industry.
Location: Morrinhos, Goiás.